From the final review: a request cancelled mid-drop no longer sails under the wrong frieze; new requests cancel running animations; Play voyage no longer sticks during the first scene and stops on any other navigation; the landing intro is revealed by the lift; Go ashore enters a landing through the frieze; Back to sea keeps keyboard focus; the timeline is compact below 900px; lyrics re-scroll after a tab switch; the shared toon gradient is no longer disposed with a landing. Co-Authored-By: Claude Opus 5.5 <[email protected]>
Specs
Approved specifications from the superpowers brainstorming workflow. Nothing non-trivial gets implemented without one.
- Naming:
NNN-short-slug.md, zero-padded, sequential. - A spec states what and why, plus acceptance criteria. Not how.
- Front matter:
status: draft | approved | implemented | superseded. No link to a plan — plans are removed before merge. - Never delete an implemented spec; it is the record of intent.