Files
Epic-The-Musical-Timeline/docs/plans
Lucas WintherandClaude Opus 5.5 0456683d1b fix(app): controller cancels instead of queueing; Go ashore; focus, narrow and lyrics fixes
From the final review: a request cancelled mid-drop no longer sails under
the wrong frieze; new requests cancel running animations; Play voyage
no longer sticks during the first scene and stops on any other
navigation; the landing intro is revealed by the lift; Go ashore enters
a landing through the frieze; Back to sea keeps keyboard focus; the
timeline is compact below 900px; lyrics re-scroll after a tab switch;
the shared toon gradient is no longer disposed with a landing.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-10-30 15:25:45 +01:00
..

Plans

Implementation plans from the superpowers writing-plans workflow. Transient: a plan lives only on its feature branch and is removed with git rm before the merge request is opened. This README stays.

  • Naming: NNN-short-slug.md, matching its spec number.
  • Links back to its spec. Bite-sized checkbox tasks with exact file paths, test commands, and commit checkpoints.
  • Written for an engineer with zero context for this codebase — spell out the obvious.
  • Tick checkboxes as you go so another agent can resume an interrupted session.
  • Front matter: status: draft | approved | in-progress. There is no done — a finished plan is deleted.