docs: the board's boundary heading, and the two readings of it
F1 described bars that carry their own not-started marking and stopped there. It now has the label naming where the running ones end, and the choice between keeping that block and dropping it for one deadline order — including why the second is a re-sort rather than a hidden heading, which is the part a future change would otherwise get wrong. The heading itself shipped a commit earlier without this; same feature, so it is written up once here rather than split across two entries. Co-Authored-By: Claude Opus 5 (1M context) <[email protected]>
This commit is contained in:
co-authored by
Claude Opus 5
parent
3db93a1ccf
commit
858551ac98
+19
@@ -137,6 +137,25 @@ rather than claiming one date the board is not ruling at. The bars themselves ta
|
||||
edge and a thinner wash of their game's hue, so what is running and what is merely scheduled
|
||||
separate at a glance without reading a single date.
|
||||
|
||||
**And the boundary itself is named.** A dashed edge says *this bar* has not started; it does not say
|
||||
where the running ones stopped, and a board read at a glance should not have to be decoded bar by
|
||||
bar to answer the question the reader opened it with. So the line between the two gets a label —
|
||||
`Not started yet`, the same object as a lane's name: a small eyebrow pinned to the left edge, in
|
||||
muted ink rather than a hue, since a hue on this board means *whose event is this*. One per lane,
|
||||
because "where does this stop running?" is a different answer for each of them.
|
||||
|
||||
**Two readings of that board, and the reader picks** (`prefs.timelineSplitUpcoming`, default
|
||||
`true` — the board as it was before the choice existed). Split keeps the unstarted events in their
|
||||
own block under that heading, and answers "what is on now, and what is queued behind it" — the shape
|
||||
of a patch. **Mixed in** drops the block for one deadline order, started or not, and answers "what
|
||||
runs out first", which is the question a Gantt chart is for: an event opening on Friday and closing
|
||||
on Sunday is a nearer deadline than one running now until October, and the split order can never
|
||||
show it. Mixed is therefore *not* the heading switched off — every order this board can be handed
|
||||
holds unstarted rows behind running ones, so dropping the label alone would leave the same block
|
||||
with nothing explaining it. `timelineLanes` re-sorts on `byDeadline`, which is `endingSoonestFirst`
|
||||
with exactly that clause removed, and it is the one case where lane mode is allowed to reorder
|
||||
inside a lane.
|
||||
|
||||
**The board draws at most two months of past.** A standing login campaign can have been running for
|
||||
half a year, and drawing from the earliest start bought months of empty calendar that nobody scrolls
|
||||
back through and that pushed every other bar off to the right. An event older than the board keeps
|
||||
|
||||