docs: plan check-in goals task by task

The goal control lives on the checklist only: "It repeats daily" already
reaches it from a non-daily event, so a second entry point added nothing.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
This commit is contained in:
Lucas Winther
2026-10-13 13:03:46 +02:00
co-authored by Claude Opus 5.5
parent 1deb0cb4cb
commit 5223a74013
2 changed files with 1178 additions and 2 deletions
File diff suppressed because it is too large Load Diff
@@ -133,8 +133,9 @@ overwrites whatever was there.
## What the reader sees
**Detail sheet — “Check-in goal”** under the daily checklist, and offered on non-daily
events too (setting one makes the event a daily). Three choices in the style of the
**Detail sheet — “Check-in goal”** under the daily checklist. A non-daily event gets there
through the existing “It repeats daily” button, so there is one entry point rather than
two; once a goal is set, it keeps the event daily on its own. Three choices in the style of the
existing status and effort controls: **Off** · **Each week** `[5] days, weeks start
[Monday]` · **Across the event** `[5] days`. Weekly `required` is 1–7; event-wide is
capped at the known number of days when the end is known.