Commit Graph
5 Commits
Author SHA1 Message Date
Lucas WintherandClaude Opus 5.5 bcbd3cc188 docs: record built-in weekly tasks
Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-10-13 14:13:30 +02:00
Lucas WintherandClaude Opus 5.5 54d8424d1e docs: record weekly and monthly tasks
The product, storage and design records now cover F17. They say why the
task and amount stores, unlike the custom-event store, never filter on
load, which is the rule a future store would most likely copy wrongly.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-10-13 13:50:08 +02:00
Lucas WintherandClaude Opus 5.5 d5ffad38c5 docs: record check-in goals
The product, storage and design records now say what a goal is, why it
never marks an event done, and why an unreadable goal is kept rather than
stripped. That last rule is the one a future cleanup would most likely
undo by mistake.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-10-13 13:18:00 +02:00
Lucas WintherandClaude Opus 5.5 21a0460ea6 fix(ui): keep one lit meter tick while an event is still running
Forty minutes left of a two-week event is under half a tick, so the
meter rounded it down to an empty strip. The most urgent rows and the
headline looked like events that were already over.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-10-01 04:18:13 +02:00
Lucas WintherandClaude Opus 5.5 8a6110396a docs: move PRODUCT and DESIGN into docs/ and list them in AGENTS
CI / Typecheck, test, feed (push) Successful in 17s
CI / Build site (push) Successful in 8s
CI / Container image (push) Successful in 17s
They are reasoning for whoever touches the interface next, which is
what docs/ holds, and the table in AGENTS.md is how an agent finds it.
The design tooling resolves both from docs/ without configuration.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-10-01 04:09:57 +02:00