Adds parseOrdinalDateTimeRange for "November 9th, 05:00 - December 4th,
2023, 04:59 (UTC-5)". Ordinal days anchor the pattern at both ends so it
cannot claim text the looser readers should get, and the year rolls back
across New Year as parseMonthDayRange does.
The offset is required rather than defaulted. parseSlashDateTimeRange has
to read its wall-clock times as UTC because its source states no zone;
here the zone is part of the format, so a cell without one returns null
instead of being silently read five hours early. Calendar validation runs
on the stated local fields, before the shift, or "February 30th, 23:00
(UTC-5)" would convert into a real instant in March.
Co-Authored-By: Claude Opus 5 (1M context) <[email protected]>
The most-named game in the release thread, and the cheapest one to add: the
GameId, hue and dailyTasks have been sitting in games.ts since launch with no
source behind them.
arknights.wiki.gg is a better source than Game8 for this game, but it is not the
mp-event shape wikigg.ts reads, so it gets its own parser. Two properties of the
page drive the code:
- Every row lists CN and Global, about five months apart. Only Global is
published; a row without one yields no event rather than borrowing the CN
date. A CN date on a Global calendar is a confidently wrong date.
- Only the next boundary carries a machine-readable timer — the end while an
event runs, the start while it is upcoming — so precision differs per side and
flips when the event goes live. An exact instant is accepted only when it
falls on the same UTC day as the date beside it, because startsAt.slice(0, 10)
is part of the event ID: a start that moved a day would orphan every
completion mark on the morning the event began.
Also sets resetOffsets for all three regions to UTC-7. Not a blanket per-game
offset — Arknights genuinely runs one Global server for every region we model,
and the page evidences the clock: every ending event ends at 10:59:59Z, which is
03:59:59 at UTC-7, one second before a 04:00 reset.
Six events, counted independently against the page before and after parsing.
Co-Authored-By: Claude Opus 5 (1M context) <[email protected]>
Adds the game and its Game8 events page, the second of the games named in
the release thread. `parseAdjacentFullRange` reads the shape this page
uses: two full dates divided by an `<hr>` rather than a dash, so a
tag-stripping reader sees only whitespace between them. It is anchored at
both ends and needs a year on each half, because without that "August 12,
2026 Day 3 rewards" reads "Day 3" as an end.
Three of the four live rows publish. "Take Your Heart" ends 30 days after
each player makes an account, so it has no calendar date and no honest
place on a calendar. "Login Campaigns" names two candidate ends
("July 16/30, 2026") — it keeps its real start and takes no end, and the
leftover is not shown as a summary either, since a date the parser
refused to trust must not reappear dressed as information.
The page lists each live event twice: once in a bare Event|Duration table
and again under its own heading with Start Date / End Date rows and a
paragraph of prose. The second copy corroborates the dates, so deduping
now fills a missing summary from the copy it drops. Dates are still taken
wholesale from the better-dated copy and never blended.
Verified by re-extracting the page independently of the parser: 4 rows,
3 events, the fourth correctly skipped.
Co-Authored-By: Claude Opus 5 (1M context) <[email protected]>
Adds the game and its Game8 events page. One `SOURCES` entry against the
existing game8 parser, plus one date shape that page needs:
`parseLabelledStartEnd` reads a duration cell holding `Start: <date>` and
`End: <date>` split by a `<br>`, which a tag-stripping reader flattens
into one run of text.
Four of the seven events say `End: Permanent`. That is the source telling
us there is no deadline, so they publish with `endsAt: null` and
`endPrecision: "unknown"` rather than a plausible date. The labelled cell
is also structure end to end, so it never becomes a summary — stripping
the leading half would leave "End: Permanent" standing where a
description belongs.
Verified by re-extracting the page with a throwaway script independent of
the parser: 7 rows in, 7 events out, every date matching.
Note the source itself is stale — its "Current Events" table still lists
January-May 2025 and "Upcoming Events" says there are none. The adapter is
right; the page looks abandoned, and Nikki coverage worth relying on needs
a second source at a higher priority.
Co-Authored-By: Claude Opus 5 (1M context) <[email protected]>
Endfield was previously written off as undatable. That was wrong: a first
pass only inspected its Duration rows (all "Permanently Available") and its
year-less version grid, and missed an "Event | Schedule & Summary" table
whose cells read "Period: 08/09/26 - 08/30/26 During the event...". Two real
events, with a year.
Adds MM/DD/YY range parsing for that shape. Month-first ordering is not
assumed lightly — Endfield's own version grid reads 01/22, 04/17, 07/16 for
versions 1.0, 1.2 and 1.4, chronological only if the month comes first.
Also stops presenting unlock conditions as descriptions. Several templates
put "Reach Union Level 8" where a blurb would go; filling the summary slot
with text that never says what the event is is worse than leaving it empty.
Wuthering Waves correctly drops to zero summaries as a result.
Co-Authored-By: Claude Opus 5 (1M context) <[email protected]>
Honkai: Star Rail and Wuthering Waves state a year on each side of a range
("Aug. 14, 2026 - Aug. 24, 2026"), which the year-on-the-end parser cannot
read.
Both also publish genuinely open-ended events — "Jul. 24, 2026 - End of
4.6", "July 10, 2026 - Permanent". Those keep their real start and report no
end, rather than being dropped or given a guessed one.
Co-Authored-By: Claude Opus 5 (1M context) <[email protected]>
Every date function returns null rather than inferring a missing year,
month or end date. A source that does not state an end yields
endsAt: null, never a plausible guess — a confidently wrong end date is
the failure this product exists to prevent.
Handles the three formats seen on Game8: "August 12, 2026",
"August 12 - September 21, 2026" (year applies to both ends, rolling the
start back when the range crosses New Year), and a slash datetime range.
Abbreviated months parse too, so a source switching to "Apr. 29" does not
silently drop events.
Co-Authored-By: Claude Opus 5 (1M context) <[email protected]>