Game8 codes pages for Star Rail, ZZZ, Wuthering Waves, Endfield, NTE,
P5X, Chaos Zero Nightmare and Umamusume, read by one table parser told
each page's active-codes heading. Each page was fetched once and pinned
as a fixture. Infinity Nikki's page is stale (still titled July 2025)
and is left out.
The Codes tab links the publisher's own redeem page where one exists
(Genshin, Star Rail, ZZZ) and gives the in-game route for every game,
and names the server on a redeemed checkbox only when there are two.
Settings uses the width of a large screen: content up to 1320px and the
menu column running the full height.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Endfield was previously written off as undatable. That was wrong: a first
pass only inspected its Duration rows (all "Permanently Available") and its
year-less version grid, and missed an "Event | Schedule & Summary" table
whose cells read "Period: 08/09/26 - 08/30/26 During the event...". Two real
events, with a year.
Adds MM/DD/YY range parsing for that shape. Month-first ordering is not
assumed lightly — Endfield's own version grid reads 01/22, 04/17, 07/16 for
versions 1.0, 1.2 and 1.4, chronological only if the month comes first.
Also stops presenting unlock conditions as descriptions. Several templates
put "Reach Union Level 8" where a blurb would go; filling the summary slot
with text that never says what the event is is worse than leaving it empty.
Wuthering Waves correctly drops to zero summaries as a result.
Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
Parsers are keyed by site template, not game: one Game8 parser serves
every Game8 page, and adapters bind a URL and game to a parser. Adding a
source for a known site is one SOURCES entry.
Game8 uses at least three templates. This handles label/value detail
tables (Genshin, 9 events) and column tables (NTE, 13 events). Its
image-grid schedule has no year and no end date, so Arknights: Endfield
is not supportable from that source and gets no adapter.
canParse is a structural tripwire: a site redesign fails the run loudly
instead of publishing an empty calendar that reads as "no events".
Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>