The product, storage and design records now say what a goal is, why it
never marks an event done, and why an unreadable goal is kept rather than
stripped. That last rule is the one a future cleanup would most likely
undo by mistake.
Co-Authored-By: Claude Opus 5.5 <[email protected]>
Forty minutes left of a two-week event is under half a tick, so the
meter rounded it down to an empty strip. The most urgent rows and the
headline looked like events that were already over.
Co-Authored-By: Claude Opus 5.5 <[email protected]>
They are reasoning for whoever touches the interface next, which is
what docs/ holds, and the table in AGENTS.md is how an agent finds it.
The design tooling resolves both from docs/ without configuration.
Co-Authored-By: Claude Opus 5.5 <[email protected]>