Commit Graph
16 Commits
Author SHA1 Message Date
Lucas WintherandClaude Opus 5.5 50c6e91b00 feat: the redesigned Event Clock
The new reader app replaces the old UI: Checklist with a rail (focus
pills, Next to expire, today's dailies, pinned routines), Timeline in a
new and a classic look, Routines, Archive and a Settings area, in a
Structured (default) and a Relaxed interface. It follows the approved
Round 6 B and Round 7 mockups, corrected screen by screen with the owner.

Reader data moves to a v2 store (gacha-tracker:v2:*). Existing v1 data
is migrated on first load, a recovery copy is written first, and the v1
keys are never removed, so a rollback finds them unchanged. Redeem codes
for Genshin arrive as their own feed.

Also: live's urgency ramp, editable per theme; completion and
section-complete fireworks; a returning-user tour; the design mockups,
specs, plans, reviews and handoff record.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-10-18 01:55:16 +02:00
Lucas WintherandClaude Opus 5.5 6e7c231160 docs(plan): battle pass windows as feed events
Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-10-16 06:09:44 +02:00
Lucas WintherandClaude Opus 5.5 42e3325a1f docs(plan): built-ins on longer cycles
Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-10-16 05:22:09 +02:00
Lucas WintherandClaude Opus 5.5 790cdd018f docs: record where built-in routines landed, and the starting points for N-week cycles and pass windows
The spec and plan say what shipped and what is still open. TODO.md gains the
next two sub-projects with the facts already gathered, the design questions to
settle and the sources to check, and a default check-in goal for To Temper
Thyself and Journey Far.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-10-16 03:10:14 +02:00
Lucas WintherandClaude Opus 5.5 e1e5fc06c3 docs: record built-in routines, per-item tracking and standard pulls
The design spec (entries with the sentence each rests on, what was looked for
and not shipped, and the facts gathered for N-week cycles and dated pass
windows), the plan, PRD F12 and F17, DATA-MODEL's prefs, and TODO.md's open
in-game checks.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-10-16 03:00:55 +02:00
Lucas WintherandClaude Opus 5.5 7c8fa7febc feat(client): move readers' marks off event ids that stop being published
An event id is a localStorage key, so a fix that changes one orphans every tick, note and ignore filed under it. retiredIds.ts holds an explicit table of old id -> new id, and the progress, daily and ignored stores move entries across on load and on import.

It moves rather than copies: a copy left under the old id would be carried forward again on every load and bring back a mark the reader had cleared. When both ids hold an entry, each store's own import merge decides, except that progress keeps any field only the older row held. The table starts empty; the change that moves ids adds its entries.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-10-14 17:46:31 +02:00
Lucas WintherandClaude Opus 5.5 0234478db0 docs: record examples to start from, and the pass over the add forms
PRD F13 said the form asked how often after Kind and had no word on
examples; F17 and DESIGN.md had no example row. Adds the spec and plan,
and ticks the TODO item.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-10-14 03:11:58 +02:00
Lucas WintherandClaude Opus 5.5 094e67d985 docs: record per-game switches for chores and built-ins
The data model, PRD F17, README and DESIGN described one global chores
switch and a checkbox per game for built-ins. Adds the spec and plan, and
ticks the TODO item.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-10-14 02:20:40 +02:00
Lucas WintherandClaude Opus 5.5 6b21b88f98 docs: plan the in-app changelog
Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-10-13 14:21:43 +02:00
Lucas WintherandClaude Opus 5.5 641c6a52b9 docs: plan built-in weekly tasks, phase 2b
Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-10-13 14:03:36 +02:00
Lucas WintherandClaude Opus 5.5 e0aca3b1fb docs: plan weekly and monthly tasks, phase 2a
Task status reuses the goal status shape, so one chip, one count and one
tally serve chores, events and tasks alike.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-10-13 13:28:28 +02:00
Lucas WintherandClaude Opus 5.5 5223a74013 docs: plan check-in goals task by task
The goal control lives on the checklist only: "It repeats daily" already
reaches it from a non-daily event, so a second entry point added nothing.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-10-13 13:03:46 +02:00
Lucas WintherandClaude Opus 5 dfb00aaa86 Correct a Task 4 expectation that contradicted its own rule
The "ancient anchor" test expected three occurrences and omitted 31 August.
With a daily rule anchored at 09:00 and no stated end, the 31st runs to
09:00 on the 1st — inside a window that opens at midnight on the 1st. The
brief's own rule is that an occurrence overlapping either edge is included,
so four is right and three was the plan disagreeing with itself.

Found by the Task 4 implementer, which corrected the test and left the
implementation alone. Verified by running occurrencesOf directly.

Co-Authored-By: Claude Opus 5 (1M context) <[email protected]>
2026-08-28 05:04:39 +02:00
Lucas WintherandClaude Opus 5 ee43270b2b Move the rename-stability test to where it can fail
Task 2's version called occurrenceId twice with identical arguments, which
any pure function satisfies — occurrenceId never takes a title, so it could
not fail the thing it claimed to pin. Task 5 passes the whole rule into
asOccurrenceEvent, so a rename is a real input there and the assertion has
something to bite on.

Found by the Task 2 review.

Co-Authored-By: Claude Opus 5 (1M context) <[email protected]>
2026-08-28 05:04:39 +02:00
Lucas WintherandClaude Opus 5 5acd64996b Move the movesOccurrences tests to the task that writes it
Pre-flight scan finding. The function is implemented in Task 2 and its four
tests sat in Task 4's block, so Task 2 would have shipped untested code and
Task 4 would have tested a function it did not write. Task 2's stated count
of 23 already assumed the corrected placement.

Co-Authored-By: Claude Opus 5 (1M context) <[email protected]>
2026-08-28 05:04:39 +02:00
Lucas WintherandClaude Opus 5 c07e37a4a7 Plan recurring custom events, task by task
Eleven tasks from the design, each with its own test cycle and commit.
Ordered so the schema field lands before anything derives from it and the
store migration is proved before a single row is expanded.

Three things the plan had to settle that the spec left to the implementer.
The overlap check is one exported predicate, because a form that restates
its schema's rule drifts from it and starts refusing saves that would
succeed. The timeline's expansion needs App to pass the same four scope
filters the lists use, so the predicate is extracted rather than copied.
And custom-ui.test.tsx renders statically with no testing-library in the
project at all, so anything needing a click is stated as a pure function
and tested directly rather than through a harness that does not exist.

Co-Authored-By: Claude Opus 5 (1M context) <[email protected]>
2026-08-27 02:10:05 +02:00